Baku Crystal Hall administrative building was built on the site 63-metres corridor which connects arena and press center. Multifunctional building was built during the First European Games Baku 2015. During the Games, offices of various departments, lockers and athletes training zone housed in this building.
Currently this building is functioning as office building for Crystal Hall staff.
43 meters long and 5 meters wide connecting corridor has kept function of transition from arena to the press center and represents oasis furnished with upholstered furniture, being some kind of a rest zone.
Two-storied building is symmetrically divided on two parts along the corridor. There are office rooms, mitting room on 25 person, lockers and technical rooms on the first floor. Office rooms and a big hall that allow spending conferences and presentations are placed on the second floor. Height of each floor of 4.5 m, and the corridor in the center – 10.6 m. Northern and southern parts are connected by the bridge at the second floor level which as represents a zone of rest.
Facades and roof and a roof are executed from panoramic glass.